Day 1 - Warings Green to Alvechurch

Wednesday 9th July - 13 miles

Set off on tour number 2 of the summer around 9.30 - dry but very breezy - needed fleeces on. Only got to Dickens Heath when steering went completely on a bend under the bridge with a hire boat coming the other way who appeared oblivious to our lack of control. Eventually got boat into the offside where Paul was able to clear the rubbish out - not before another two boats had passed.

Saunter along boat stopped prior to drawbridge waved us through and kept bridge open for quite a time. I bet the drivers were happy not! This boat was called Saunter Together - we saw a lot of them in the next 48 hours.


Wast Hills Tunnel
Horn failed again approaching Kings Norton junction. We stopped in our usual spot for lunch.

Brightened up a lot but still very breezy. Moored at Alvechurch for the night - able to sit out and read. Lots of ducks, geese and a tern gathered when a man came to feed them. He said he came down every evening - I think they were expecting him.



Worcestershire Countryside from Bittell Moorings

















Bittell Reservoir
















Mooring at Alvechurch



Watched the Tour de France highlights and the second world cup semi final, very different to last nights Argentina won on penalties.






No comments:

Post a Comment